![]() Previously reported results at Ngula 1 include: The current drill program has made a significant contribution to the understanding of the geological controls and attitude of these zones. The intersections achieved to date highlight that the mineralization as well as the structural deformation and alteration zones pinch and swell, and it is interpreted that this is controlled by the intersection of the structures that are developed in three primary directions, east-west, northeast southwest and northwest-southeast (similar to Bulyanhulu). These shears almost ubiquitously host gold mineralization within multiple highly foliated, altered and veined structures. Ngula 1 is a 600m long 120-200m broad zone hosting multiple east-west trending shear zones. This cross structure and its intersection with the main structures and other northwest trending cross structures is considered a key component of the geological control of wide and potentially high-grade mineralization at Ngula 1. These results are associated with robust geology comprising narrow to wide zones of strong shearing of the host rock, with associated alteration, quartz veining and sulphide mineralization. Significant strong sulphide mineralization encountered in this cross structure returned positive gold results that are expected to improve with depth. The recent drilling at the target totals 1,390m and 11 drillholes (excluding one abandoned drillhole).īest intersections returned in the recent drillholes include 5.22g/t Au over 1.93m from 107.18m 4.14g/t Au over 3.85m from 118.49m, including 7.03g/t Au over 2.08m 19.90g/t Au over 0.57m from 35.24m and 1.68g/t Au over 5.28m from 72.45m.Īll holes logged and sampled to date intersected multiple gold mineralization except for one drill hole.Ī set of drillholes targeted a known northeast trending structure that had never been drilled. All drillholes intersected gold mineralization with one exception and a previously recognized, but undrilled cross structure, returned significant gold intersections associated with abundant sulphide, strong deformation and alteration.Ī total of 3,586m of drilling has been completed at Ngula 1 in this phase of drilling, comprising a total of 23 drill holes. The Company planned a 7,000m programme of drilling of which 4,648m was completed before the drillers break commenced in December, drilling recently recommenced and is expected to be completed by the end of February. (TSXV: TEM) (FSE: T23A) ("Tembo" or the "Company") is pleased to announce further encouraging Ngula 1 target results from the ongoing diamond drilling campaign on the Company's Tembo Project in Tanzania. Vancouver, British Columbia-(Newsfile Corp.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |